The soffit above the bar has been drywalled and the first coat of mud has been applied. |
|
 |
 |
|
The drywall on the soffit above the bar is nearly completed. |
|
|
The laterals are being installed off the main HVAC duct. |
|
 |
 |
|
The exhaust hood in the kitchen is secured and the ducting is being installed. |
|
|
This is the main HVAC trunk running across the tasting room. |
|
 |
 |
|
Here we are getting ready to raise the 12' wide exhaust hood in the kitchen. |
|
|
The wall tile around the mop sink is being installed. |
|
 |
 |
|
The wall tile is going up in the restrooms. |
|
|
The floor tile in the mechanical room is set in place, nearly ready to be grouted. |
|
 |
 |
|
The tile backer board is installed around the location of the mop sink in the mechanical room. |
|
|
The floor tile has been completed in the men's restroom. |
|
 |
 |
|
Here is the soffit above the tasting bar. There will be a series of pendant lights above each tasting area and cabinets located on the wall behind the bar. |
|